Kitchen Progress- Almost Complete!

IMG_1939[1]

 

For the past few days Nate and I have been working like crazy on the kitchen and now we are finally able to see some fruits to our labor.

Things we’ve accomplished since Sunday:

1) Attached new hinges and hardware to cabinet doors.

2) Attached doors back on to cabinet boxes.

3) Installed new dishwasher

4) Finished installing butcher block countertops

5) Installed a new range hood

6) Installed beadboard on sink side as a backsplash.

Things still on the to do list:

1) Install beadboard behind range and ends of cabinets

2) Spackle and paint beadboard

3) Install crown molding and trim pieces

4) Paint ceiling

For now I am just happy to be able to put all of my dishes back in place and bring order back to my house after several months.

It truly is amazing how much paint can transform a room. We love looking at the progress we’ve made so far.

Our kitchen started out like this:

IMG_0661

 

IMG_1530[1]

 

And now looks like this:

IMG_1938[1]

 

IMG_1941[1]

 

So much better already! Once we have completely finished our renovation I will be going through all of my receipts in order to break down all of the costs involved in our makeover. That will be interesting for sure since I have no idea what the total cost will come out to. πŸ™‚

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s