House In Progress

Next month we will have lived in the house for a year. With this upcoming anniversary I thought it would be neat to document what we’ve done and what still needs to be accomplished in each room. This post is completely inspired by Young House Love’s recent progress post.

Here we go!

Entrance- 70% Complete

IMG_0447[1]

 

IMG_0835[1]

 

IMG_0863[1]

 

To Do List:

1.) Paint

2.) DIY Board and Batten

3.) Paint Door

4.) Replace door hardware

5.) Taller entrance table

6.) Replace and add entrance artwork

7.) Add crown molding

 

Sitting Room- 65%

IMG_0919[1]

IMG_0858[1]

IMG_0786[1]IMG_0865[1]

 

To Do List:

1.) Replace carpet with laminate

2.) Paint trim white

3.) Hang curtains

4.) Create Library

5.) Hang artwork and mirror

6.) Rugs

7.) Reading chair?

8.) Coffee table?

Dining Room- 70% Complete

IMG_0861[1]

IMG_0868[1]

IMG_0886[1]

 

To Do:

1.) Replace carpet with laminate

2.) Create coffee bar

3.) Replace dining table and chairs

4.) Replace chandelier

5.) Reorganize coffee bar

6.) Complete plate wall collection

7.) Add rug

Kitchen- 10% complete

IMG_0661

 

To Do:

1.) Replace light fixtures

2.) Replace faucet and garbage disposal

3.) Replace Fridge

4.) Tear down backsplash and replace with tile

5.) Replace countertops

6.) Paint cabinets

7.) Replace cabinet hardware

8.) Replace stove, dishwasher, and microwave

9.) Paint ceiling

10.) Remove island? (Still deciding based on countertops)

11.) Renovate pantry closet

Family Room- 20% complete

IMG_0662

 

To Do:

1.) Replace carpet with laminate

2.) Paint trim white

3.) Paint wallsΒ  (hate the color, will be repainting soon)

4.) Mount TV on wall

5.) Paint beams white

6.) Replace couch, chair, and coffee table

7.) Replace rug

8.) Hang artwork

9.) Replace fan with light fixture?

Guest Bath- 10% complete

IMG_0685

 

To Do:

1.) Replace shower curtain

2.) Take down window valence and replace

3.) Clean out vanity and paint

4.) Frame mirror

5.) Replace shower head

6.) Replace towel rack

7.) Paint!

8.) Hang art

9.) Move litter box?

Guest Room #1- 85% complete

IMG_0873[1]

 

IMG_0876[1]

 

 

To Do:

1.) Replace carpet with laminate

2.) DIY Board and Batten

3.) Paint

4.) Hang curtains

5.) Buy furniture (bed and dresser)

6.) Bedding and pillows

7.) Art

8.) Rug

9.) Closet doors

10.) Replace fan with light fixture.

Guest Bed #2- 65% completed

IMG_0881[1]

 

To Do:

1.) Replace carpet with laminate

2.) Organize room clutter

3.) Textiles

4.) Hang art

5.) buy a desk?

6.) Rug

7.) Replace light fixture

8.) Reading chair/nook

9.) Paint trim

Master Bedroom- 30% complete

IMG_0658

 

To Do:

1.) Replace carpet with laminate

2.) Paint trim and doors white

3.) Add pet door to sliding glass door

4.) Replace bedding

5.) Replace nightstands and lamps

6.) Hang art

7.) Repaint walls

8.) Renovate closet

9.) Add reading nook

Master Bath- 10% done

IMG_0669

 

To Do:

1.) Replace showerhead

2.) Paint walls!

3.) Paint or replace vanity and hardware

4.) Frame mirror

5.) Replace ventilation system

6.) Hang art

7.) Replace light fixture

8.) Replace blinds

Sunroom- 0% completed

IMG_0670

 

To Do:

1.) Paint walls!

2.) Replace window blinds

3.) Paint trim and door white

4.) Add artwork

5.) Rug

6.) Cat playarea

7.) Lounge area

8.) Storage area

Misc. Closets (3)-

1.) Replace patch of carpet

2.) reorganize shelving and paint

Garage-

1.) Reorganize and sell unwanted items

2.) Deep Clean

3.) Laundry nook: clean out shelves, tear out/replace sink, replace washer and dryer, flooring, and paint.

There we go. Our house progress 11 months in.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s